about us | FAQs | site map | contact us | help   

 
Responses for the June 2007 ICC-ES Evaluation Committee Meeting

Tuesday, June 5, 2007

  1. AC133—Steel Bar Reinforcement Reinforcing Bars. Revisions are proposed to update the criteria, clarify some of its sections, and address issues arising from cases of multiple manufacturing locations. click here for responses
  1. AC358-0607-R2-Helical Foundation Systems and Devices. A new criteria is proposed for determining structural capacities of helical foundation systems. An earlier version of this criteria was discussed at the February 2007 Evaluation Committee hearing. click here for responses
  2. AC122-0607-R1-PP, PEX, PEX-AL-PEX, and PP-AL-PP PIPING, Tube and Fittings Used in Radiant Heating and Water Supply Systems. A revision is proposed to add and update referenced standards. click here for responses
  3. AC17-0607-R2-Glass Glazed Unit Skylights and Sloped Glass Glazing. Following a period of public comment, revisions are proposed to update the criteria to the 2006 International Codes, to add provisions for PVC glazing retainers and frames, and to include specifications for weather-sealing materials. click here for responses
  4. AC16-0607-R2-Plastic Glazed Skylights. Following a period of public comment, revisions are proposed to revise conditions of acceptance for some testing, to include specifications for water-sealing materials, to limit use of skylights with plastic frames, and to update the criteria to the 2006 International Codes. click here for responses
Wednesday, June 6, 2007
  1. AC353-0607-R2-Stay-in-place, Foam Plastic Insulating Concrete Form (ICF) Systems for Solid Concrete Walls. A new criteria is proposed for ICFs used for jobsite construction of solid concrete walls, where the ICFs remain in place after concrete placement. An earlier version of this criteria was discussed at the June 2006 Evaluation Committee hearing. click here for responses
  2. AC193-0607-R1-Mechanical Anchors in Concrete Elements. Numerous issues have been raised by ICC-ES staff and industry that may require revisions to the criteria. click here for responses
  1. AC15-0607-R1-Concrete Floor, Roof and Wall Systems and Concrete Masonry Wall Systems. Revisions are proposed to limit the application of this criteria for wall systems to certain seismic design categories and seismic zones. The criteria is also updated and editorially revised. click here for responses
  2. AC375-0607-R1-Field-constructed Fireplace Systems Using Prefabricated Blocks. A proposed new acceptance criteria applies to fireplace systems (fireplace unit and chimney) that are assembled in the field using prefabricated blocks of either refractory masonry or reinforced precast lightweight concrete masonry. click here for responses

 

 
Download and install the free Adobe Acrobat Reader.
Download Acrobat Reader