about us | FAQs | site map | contact us | careers | help   

Evaluation ReportsPMG Listing ProgramBuilding Products Listing ProgramEnvironmental Programs


Responses for the June 2011 Evaluation Committee Meeting (through June 2, 2011)

Tuesday, June 7, 2011

  1. AC304 — Proposed Revisions to the Acceptance Criteria for Inspection Agencies. Revisions are proposed to incorporate new ICC-ES requirements for inspections of manufacturing facilities. Click here.

Wednesday, June 8, 2011

  1. AC433 Proposed Acceptance Criteria for Liquid Borate Fungal Decay and Termite Resistant Treatment Applied to Wood Members. A new criteria is proposed to evaluate borate termiticide-fungicide factory-applied to the surface of wood products prior to construction in order to protect the structure from subterranean termites and fungal decay. Click here.
  1. AC326 Proposed Revisions to the Acceptance Criteria for Proprietary Wood Preservative Systems - Common Requirements for Treatment Process, Test Methods and Performance. Revisions are proposed to update the standards referenced in Section 1.3.2 of the criteria, revise the criteria to require minimum retentions to be specified to two or more significant figures, reference AWPA M22-11, and to clarify warning and disqualification status of treatment facilities and third-party reporting status to ICC-ES. Click here.
  1. AC90 Proposed Revisions to the Acceptance Criteria for Fiber Cement Siding Used as Exterior Wall Siding. Revisions are proposed to clarify that the criteria applies to walls and to clarify that the transverse load tests and the racking shear tests are of the siding material only. Click here.

Thursday, June 9, 2011

  1. AC58 Proposed Revisions to the Acceptance Criteria for Adhesive Anchors in Masonry Elements. Revisions are proposed to establish conformity between this criteria and AC308 in several important respects and to incorporate changes proposed in MISC1 on the agenda. Click here.
  1. AC385 Proposed Revisions to the Acceptance Criteria for Special-purpose Sprinkler Heads Used with Fixed Glazed Assemblies to Provide a Fire-resistance-rated Wall Assembly (2012 IBC). Revisions are proposed to update the criteria to the 2009 and 2012 IBC in the light of code changes that affect this criteria and to prohibit horizontal mullions in the glazed assembly that would interfere with the uniform distribution of the water flow across the surface of the glass. Click here.